Connections to Third-Party Systems

Sungrow: connection via measuring module

What do you need?

Niko requirements

Your Niko Home Control installation meets the following requirements:

Depending on the installation type, you need the following connections and additional products:

Sungrow requirements

Your system is one of the following Sungrow products*:


Single-phase

Three-phase

String inverter

  • SG2.0RS-S / SG2.5RS-S / SG3.0RS-S

  • SG3.0RS / SG3.6RS / SG4.0RS / SG5.0RS / SG6.0RS

  • SG3.0RT / SG4.0RT / SG5.0RT / SG6.0RT / SG7.0RT / SG8.0RT

  • SG10RT / SG12RT / SG15RT / SG17RT / SG20RT

  • SG30CX / SG33CX / SG40CX / SG50CX / SG110CX / SG110CX-20 / SG110CX-NI

Hybrid inverter

  • SH3.0RS / SH3.6RS / SH4.0RS / SH5.0RS / SH6.0RS

-

*Consult the website of the supplier for detailed specifications and the latest products.

Wiring diagrams

Connecting a measuring module on bus

In case you have a single-phase inverter, you can measure the inverter and two other circuits:

wiring

In case you have a three-phase inverter, you will need all clamps of the measuring module to measure the energy flow of the inverter:

wiring
wiring

Connecting a wireless measuring module

In case you have a single-phase inverter, you can measure the inverter and two other circuits:

wiring

In case you have a three-phase inverter, you will need all clamps of the measuring module to measure the energy flow of the inverter:

wiring
wiring

Programming of the Sungrow connection

Configure the measuring module via the Niko Home Control programming software. For more information, see Creating an energy reading.