Installation of TYTAN® TH1

The installation should be carried out by a qualified installer and in accordance with the regulations of the local distribution system operator.

Step 1

Click onto the DIN rail.

Pay attention to the rated diversity factor (RDF) according to IEC/EN 61439-1.

Installation

Step 2

Only use suitable wires:

  • Copper

  • Rigid, stranded or flexible

  • Cross section 1,5 – 35 mm2

Strip the wires. Use ferrules for flexible wires.

Installation

Step 3

Optionally, connect the main protection relay and up to 12 fuse switch disconnectors, using TYTAN® HC bus cables (961-9620300).

Feed the main wires at the bottom of the fuse switch disconnector and the consumption at the top. Secure with 3 Nm, using a PZ2 screw driver.

Use the wiring diagram to connect the wires correctly. For the maximum number of wires that can be connected, refer to the table below.

Installation

Step 4

Remove the placeholder and insert the fuse link.

4.1 Remove the placeholder.

961-0240300_TG003.png

 

4.2 Depending on the chosen fuse link, insert the appropriate gauge ring.

Use the fitting tool to insert the correct ring. The gauge ring differs when using a D01 or D02 fuse link and adapter spring.

tytan

Step 5

Assemble the fuse link.

tytan

Step 6

Insert the fuse link.

tytan

Step 7

Switch ON.

switch

Step 8

Check the fuse within 24 hours after switching ON:

  • The average operation temperature must be less or equal to 35 °C.