You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Current »

Starting point

Procedure

  1. Click on the symbol of the basic action. 
    Result:
    The Basic action pane appears and shows:
    • the name of the basic action;
    • an overview of all players linked to it and their behaviour and parameters.
  2. You can do the following:

    • Click on the minus sign of a linked player to unlink the player from the basic action.

    • Click on the plus sign of a linked player to link the player to the basic action.
  3. Click the Close button to return to the Create overview window.

Warning: a basic action must comprise at least one output and one control, otherwise you cannot save the basic action.

  • No labels