Software Manual Niko Home Control I
Dutch English French Danish Slovak German Polish Swedish
Dutch English French Danish Slovak German Polish Swedish

Cabinet set-up: change order of outputs

How can I change the order of the outputs under Cabinet set-up?

Go to Cabinet set-up in the menu at the top of the screen. 

Click on the Assign outputs tab.

You will now see the plan of the home on the left and, on the right, a table with the modules that are present in the cabinet.

https://s3-eu-west-1.amazonaws.com/guideimages/ScreenShots/V1.0/EN/054-v1906627-001.png

Click on the module for which you wish to change the order of the outputs.

On the left, you will now see the plan of the home and, on the right, details of the module. 

https://s3-eu-west-1.amazonaws.com/guideimages/ScreenShots/V1.0/EN/054-v1906627-002.png

To assign an output to another contact, click on the black button at the end of the relevant line.

Keep the mouse button pressed and drag the output to the desired contact.

https://s3-eu-west-1.amazonaws.com/guideimages/ScreenShots/V1.0/EN/054-v1906627-003.png

Click on save.

The order of the outputs has now been changed.